Electronics is the Indian industry that grew fastest in the last decade and the one most graduates still describe from memory. In FY15 India made ₹1.9 lakh crore of electronics a year. In FY26 it made ₹13.11 lakh crore, and smartphones became the country's largest single export product. That speed produces a lot of confident advice and very little arithmetic.
This report answers three questions with numbers that can be checked: which part of the sector is actually growing, what each job optimises for, and which skills the sector is currently short of. Everything below comes from Ministry of Electronics and Information Technology releases, Cabinet decisions, company filings and budget documents, with the period stated. Start with the one-page brief.
Every chart below uses the same six colours, and each one always means the same thing.
October 2026
FY26 means the year ended 31 March 2026, throughout this report
- Production rose 15.8% to ₹13.11 lakh crore.
- Smartphones became India's largest single export product, ahead of petroleum products.
- Electronics imports rose to US$116.17 billion, up 17.8%.
- Dixon's March-quarter profit fell 36% even as revenue grew.
- Component scheme outlay raised to ₹40,000 crore in the Union Budget.
- Micron's Sanand plant began commercial production in February 2026.
- Assembly hires the most people; components and design hire the most engineers per rupee.
- Learn yield and domestic value addition. They decide what gets funded.
Each figure is dated; sources are named in the section that discusses it
1. Why look at this sector at all
Four things make electronics worth a serious look, and one should give you pause.
It is the fastest-growing large manufacturing industry in the country. India produced ₹13.11 lakh crore of electronics in FY26, up 15.8% on the year and nearly seven times the ₹1.9 lakh crore of FY15, according to the Ministry of Electronics and IT's statement to Parliament in July 2026. Very few industries of that size have grown that fast for that long.
It has become an export industry almost by accident of policy. Electronics exports reached US$47.96 billion in FY26, making electronics India's third-largest export category, and smartphones moved from the 153rd largest export item in FY15 to the single largest in FY26, on MeitY's own figures. An export industry hires to global quality standards, which changes what a first job teaches you.
It employs at scale, and unusually, it employs women at scale. The ministry puts direct and indirect employment in electronics manufacturing at about 25 lakh, of which about 12 lakh is in mobile phones, and says women make up about 70% of the direct mobile manufacturing workforce. The 25 lakh figure is an industry estimate rather than a census count, and the ministry says so.
Public money is moving, and it is moving upstream. The Electronics Component Manufacturing Scheme had its outlay raised to ₹40,000 crore in the Union Budget 2026-27, and in July 2026 the Cabinet approved a second phase of the India Semiconductor Mission worth ₹1,27,500 crore. Announced money is the closest thing this sector has to a hiring forecast.
And the caution: most of the value is still imported. India imported US$116.17 billion of electronics in FY26, more than twice what it exported. A plant can produce a crore of phones and still add a modest share of their value in India. Where you join inside the chain matters more here than in almost any industry in this series.
Each band carries a headline number and the evidence behind it
- Electronics produced in India in FY26, up 15.8% on FY25's ₹11.32 lakh crore.
- Mobile phones were ₹6.27 lakh crore of that, up from ₹18,900 crore in FY15.
- Mobile manufacturing units went from 2 in 2014 to more than 300.
- 99.2% of the phones used in India are now made in India.
- Electronics exports in FY26, up from US$38.5 billion in FY25.
- Mobile phone exports were about ₹2.6 lakh crore, against ₹1,566 crore in FY15.
- Smartphones are now India's largest single export product.
- Tamil Nadu alone shipped 41.63% of the country's electronics exports in FY26.
- The component scheme's outlay, raised from ₹22,919 crore in the Union Budget 2026-27.
- 106 component projects approved by 17 August 2026, with ₹69,548 crore of investment.
- India Semiconductor Mission 2.0 approved at ₹1,27,500 crore on 15 July 2026.
- The production-linked incentive for phones had paid out about ₹19,091 crore, on official data reported in September 2026.
- India's share of the global chip design workforce, on an industry estimate cited by MeitY.
- About 70,000 engineers trained under the Chips to Startup programme by September 2026.
- 254 chips taped out under the same programme by August 2026.
- 24 chip design projects approved under the Design Linked Incentive scheme.
- Electronics imports in FY26, up 17.8% in a year and more than twice exports.
- Chips, displays and camera modules are still overwhelmingly imported.
- Contract manufacturers run on thin margins; Dixon's adjusted operating margin was under 4%.
- US tariff policy remains a live risk, although smartphones have so far been exempted.
2. How big it is, and how fast it is really growing
Start with a distinction that separates people who have read about this sector from people who understand it. You will see one number quoted in almost every article on Indian electronics: US$500 billion of production by 2030-31. That figure is a government target. It has not been measured. An earlier target of US$300 billion by 2025-26 was set in a 2022 vision document, and actual FY26 production, ₹13.11 lakh crore, is roughly half of that. Quoting a target as though it describes the sector today is the fastest way to lose an interviewer.
What has actually been measured is production, exports and imports. Production was ₹11.32 lakh crore in FY25 and an estimated ₹13.11 lakh crore in FY26. Exports were ₹3.27 lakh crore in FY25 and about ₹4.24 lakh crore in FY26. Those are the numbers that decide whether a plant expands.
The second measured thing, and the more important one for a career, is the shape of the industry. India does not have one electronics business. It has one very large product, the phone, and a long tail of everything else, and each part of that tail is a different employer with different jobs.
Indian electronics, ₹ lakh crore for production and exports, US$ billion for trade
The import bar is drawn on the dollar scale of the export bar, so the two can be compared directly: imports were about 2.4 times exports in FY26. Production and export figures from MeitY statements to Parliament in July 2026; FY26 production is described there as an estimate. Imports from Commerce Ministry data reported in April 2026.
If you are asked how big Indian electronics is, give what was measured and the year: “₹13.11 lakh crore of production in FY26, almost half of it mobile phones, with US$47.96 billion of exports”. If you are asked about US$500 billion, say what it is: a government target for 2030-31, not a measurement. Answering the first question with the second number is the tell that you have memorised a headline rather than read a report.
The third measured thing is direction, and here the sector splits in two. Assembly has grown enormously: mobile phone production went from ₹18,900 crore in FY15 to ₹6.27 lakh crore in FY26, and mobile exports from ₹1,566 crore to about ₹2.6 lakh crore. But imports kept pace, rising to US$116.17 billion in FY26 from US$98.6 billion the year before, because the chips, displays and modules inside those phones still mostly arrive from abroad.
There is a third movement underneath both, and it is the one that changes where the jobs are. The government has stopped paying mainly for assembly and started paying for components. The phone incentive scheme's budget line fell to ₹1,345 crore for 2026-27 from ₹6,960 crore in the revised estimate for 2025-26, while the component scheme went from ₹7 crore to ₹1,500 crore and semiconductors from ₹4,300 crore to ₹8,000 crore. An industry can keep growing at the assembly end while its new money moves somewhere else entirely.
Each one is measured, and each one implies a different kind of job
- Mobile production reached ₹6.27 lakh crore in FY26.
- More than 300 mobile units, against 2 in 2014.
- The largest employer of operators and shop-floor engineers.
- US$116.17 billion in FY26, up 17.8%.
- Imports were about 2.4 times exports.
- Every rupee of this is a component someone in India could be paid to make.
- 106 projects approved, ₹69,548 crore of investment.
- 38 plants operating by August 2026.
- Expected to create 74,628 direct jobs.
- Government vision of US$500 billion of production by 2030-31.
- The earlier US$300 billion target for 2025-26 was missed by about half.
- Useful as direction. Never quote it as a current figure.
3. Who leads, who is stuck, and what that tells you
This is the most useful table in the report if you are choosing an employer, and it starts with a fact that surprises almost everyone. The largest listed electronics manufacturer in India, Dixon Technologies, reported ₹49,586 crore of revenue in FY26. Tata Electronics, which is not listed,“reported revenue of about ₹1.3 lakh crore in the same year, and Samsung's Indian subsidiary reported ₹1,11,183 crore in FY25. The biggest employers in this sector are mostly not on the stock exchange.
The reason is structural: most phones made in India are assembled by unlisted subsidiaries of global groups, by Tata, and by contract manufacturers. What follows is the listed, reported part of the sector, where the numbers are audited and public. Treat it as a map of where professional hiring happens, not as a measure of the sector's size.
Revenue for the year ended 31 March 2026, Rs crore
Consolidated revenue from operations from each company's FY26 results, except Bharat Electronics and Centum Electronics, which are standalone, and Dixon, whose figure includes other income as the company reported it. Blue bars are defence and government-led electronics, amber bars contract and original design manufacturers, purple is chip design services, and red marks the one decline. Tata Electronics, Foxconn's Indian units and Samsung India are excluded because they are not listed.
Two patterns are worth carrying into any conversation about this sector. The first is that scale and margin have separated. Dixon earned ₹49,586 crore and made an adjusted operating margin under 4%. Data Patterns earned ₹925 crore, roughly one fifty-fourth as much, and kept about 29 rupees of every hundred as net profit. Revenue tells you very little here about the kind of engineering you would be doing.
The second is that the businesses that own their designs earn far more per rupee than the businesses that build to someone else's. Bharat Electronics designs its own systems and earned a net margin of about 22% in FY26. The large contract manufacturers build to a brand's specification and earn a few per cent. That divide runs through the rest of this report.
4. Where the growth actually sits
Here is the pattern that matters most for anyone joining. In FY26 the electronics businesses that grew fastest were not the biggest brands. They were contract manufacturers taking on new customers, and defence electronics companies working through long order books. The ones that stalled were those dependent on a single product line or a handful of large orders.
Year-on-year growth in revenue, year ended 31 March 2026
Cyient DLM is the one negative bar and is shown in red on a scale of absolute size, so its bar length shows the size of the fall, not a gain. All eleven figures are for the same period, the year ended 31 March 2026, which is why they can be compared directly. Bharat Electronics and Centum are standalone figures. Source: each company's FY26 results.
Averaging those groups makes the point sharper. The six contract and design manufacturers grew about 28% between them. The four defence and government-led businesses grew about 14%, pulled down by Cyient DLM's fall. Growth is in volume manufacturing; margin, as Section 7 shows, is in owning the design. This is not a story about good companies and bad companies. It is a story about two different ways to make money from the same circuit board.
Underneath the companies, the largest single source of new activity is not private at all. The Electronics Component Manufacturing Scheme, notified in April 2025 with ₹22,919 crore and raised to ₹40,000 crore in the Union Budget 2026-27, had approved 106 projects across 15 states by 17 August 2026, carrying ₹69,548 crore of investment against the ₹59,350 crore the scheme was designed to attract. The ministry expects those projects to produce ₹5,34,101 crore of components and create 74,628 direct jobs, and says 38 of the plants are already operating, according to the Cabinet approval of the latest tranche.
Each one is backed by either a company result or a committed public outlay
- ₹40,000 crore scheme outlay after the Union Budget 2026-27.
- 106 projects approved, ₹69,548 crore of investment.
- Expected to create 74,628 direct jobs.
- 12 projects approved, about ₹1.64 lakh crore.
- Five units in commercial production by September 2026.
- A second phase worth ₹1,27,500 crore approved in July 2026.
- Avalon grew 46%, Kaynes 33%, Syrma 27%.
- Order books of ₹8,366 crore at Kaynes and ₹2,196 crore at Avalon.
- Customers are brands and industrial firms, so the buyer is an engineer, not a shopper.
- Bharat Electronics' order book was ₹73,882 crore at 1 April 2026.
- Data Patterns grew 30.6% with a net margin of about 29%.
- Long programmes, long careers, and design work done in India.
“Which parts of this product are made or designed in India, and which are imported?” Almost no candidate asks it. If the answer is that almost everything arrives as a kit, you will be measured on throughput and yield. If the plant makes boards, modules or chips, or the team owns the design, you will be measured on quality, cost and engineering change. Those are two very different jobs inside what looks like the same industry.
5. How a product gets made, and the jobs that do it
Indian electronics does not have one kind of employer. It has four layers, each running at a very different scale, and almost every entry-level role sits inside one of them. Knowing which layer you are applying to explains most of what the job will actually feel like.
Scale figures are the most recent measured or approved ones, with the date stated
The assembly layer is enormous, and it is where most jobs still are. It is also, unusually for an Indian industry, being rebuilt in public: every component and semiconductor project the government funds is announced with its investment, its location and its expected jobs.
Plants, projects and institutions in Indian electronics, most recent published counts
Shown as counts rather than as bars, because the units are not comparable: a phone assembly line and a semiconductor packaging plant differ by orders of magnitude in investment. Mobile unit count from MeitY; project counts from Cabinet and MeitY releases; institution count from MeitY’s August 2026 update on the Chips to Startup programme.
Four terms run through every conversation in this sector, and candidates routinely get them wrong. EMS, electronics manufacturing services, is a company that builds products to a brand's design; an ODM, original design manufacturer, also owns the design and sells it to brands. SMT, surface-mount technology, is the line that places components on a circuit board, and it is where most graduate engineers spend their first year. Yield is the share of units that pass test first time, and it is the number every manufacturing engineer is measured on. Domestic value addition is the share of a product's value created in India rather than imported, and it is the number the government is now trying to raise.
6. The chip push, and what is real so far
This is the part of the sector that changed fastest, and the part where most students' mental model is either too optimistic or too dismissive. In December 2021 the Cabinet approved the Semicon India programme with an outlay of ₹76,000 crore, run through the India Semiconductor Mission. By July 2026 it had approved 12 projects worth about ₹1.64 lakh crore: one silicon fab, one silicon carbide fab, one display fab and nine assembly, testing and packaging units. It is worth seeing exactly how much of that is running before you build a career plan around it.
Approved investment, ₹ crore, as stated by the government
Amber bars are units in commercial production; teal bars are approved and under construction. Not shown: ASIP in Andhra Pradesh (₹468 crore), CDIL at Mohali (₹117 crore, producing), and Crystal Matrix at Dholera with Suchi Semicon at Surat (about ₹3,936 crore together, approved May 2026, Suchi producing). Investment figures from MeitY, April 2026; status from MeitY, September 2026.
The clearest single milestone arrived on 28 February 2026, when Micron began commercial production of memory products at its ₹22,516 crore assembly and test plant at Sanand in Gujarat. Kaynes had already shipped India's first commercially packaged multi-chip modules from Sanand in October 2025, and two more units, CDIL at Mohali and Suchi Semicon at Surat, were inaugurated during SEMICON India on 17 September 2026. The fab is slower: a Bloomberg report in July 2026 said Tata Electronics' Dholera plant now expects commercial production in mid-2028, starting mainly on 90-nanometre technology. Almost no candidate walking into an interview can separate those two timelines, and it changes the answer to “when will India make chips”.
The policy story did not stop when the first projects were approved. It widened. On 15 July 2026 the Cabinet approved a second phase of the mission worth ₹1,27,500 crore, covering equipment, materials, packaging, design and talent rather than fabs alone. The design side is already running: the Design Linked Incentive scheme has approved 24 chip design projects, and the Chips to Startup programme gives free design tools to 332 institutions, whose students had taped out 254 chips by August 2026.
Four columns worth separating before an interview
- Chips are being packaged in India: 5 units in commercial production.
- Micron's Sanand plant has produced memory since February 2026.
- 99.2% of phones used in India are now made in India.
- No commercial silicon fab yet. Dholera is now expected in 2028.
- Electronics imports still rose 17.8% in FY26.
- Most chips inside Indian-made phones are still imported.
- Chip design talent: about 70,000 engineers trained under Chips to Startup.
- 24 design projects approved under the Design Linked Incentive scheme.
- Component plants: 38 already operating under the component scheme.
- US$500 billion of electronics production by 2030-31.
- The second semiconductor mission is approved, not yet spent.
- Neither has been measured. Both are direction, not data.
The career point. Assembly still carries the overwhelming majority of the jobs, and it is where most people should expect to start. But the roles that combine electronics with something harder to find, process engineering for packaging, test engineering, reliability, chip verification, are the ones currently short of people. That is because the plants were approved faster than any university started training for them.
7. How the money is made, and what you will be measured on
This section exists for one reason. Whatever role you take in electronics, your work will be judged by how it moves one of four blocks. People who can name the block they affect get promoted noticeably faster than people who cannot.
A structure diagram, not measured data. The margins it produces are measured, and they are in the table below
This diagram shows the structure of the profit and loss account. It contains no estimated percentages for each block, because no company in this sector publishes a standardised cost split.
The number the sector is judged on is the margin, and the spread across Indian electronics businesses in FY26 is extraordinary. Companies working on the same kind of circuit boards, in the same country, produce margins that differ by a factor of seven or more.
Read that table as a warning about a single word. Scale in electronics does not automatically create margin, because the largest cost, the bill of materials, rises with every unit you make. Margin comes from owning something the customer cannot easily get elsewhere: a design, a qualification for defence or aerospace work, or a process that yields better than a competitor's.
Two lines deserve precision because they shape day-to-day work. Yield, the share of units passing test first time, is the single biggest driver of conversion cost in any high-volume plant: on a line running on a 4% margin, a few points of scrap can erase the profit entirely. Capacity utilisation is the share of a line's available hours actually spent producing, and in new component and semiconductor plants it is often the number the whole business plan depends on. If you join a manufacturing team, expect to be measured on yield long before you are measured on anything else.
8. What is being built, and where
Announced money is the closest thing this sector has to a hiring forecast, and unusually for Indian manufacturing, most of it is public and published. The Union Budget for 2026-27 gives the Ministry of Electronics and IT ₹21,633 crore, up from a revised ₹20,233 crore for 2025-26, and the mix inside that number has shifted sharply towards semiconductors and components, according to the PRS analysis of the ministry's demand for grants.
Budget estimates for the year to 31 March 2027, ₹ crore
Percentages are the change against revised estimates for 2025-26: Semicon India ₹4,300 crore, the component scheme ₹7 crore, and the large-scale electronics manufacturing incentive ₹6,960 crore. The Semicon India line includes ₹900 crore for the Semi-Conductor Laboratory at Mohali. Source: PRS Legislative Research analysis of Demand for Grants 2026-27, Electronics and Information Technology.
The single largest commitment is not in this year's budget at all. The second phase of the India Semiconductor Mission, approved by the Cabinet on 15 July 2026, commits ₹1,27,500 crore across six areas, from fabs and packaging to equipment, materials, design and talent, according to the Cabinet decision. The ₹1,000 crore in the 2026-27 budget is only the first year's provision. For anyone considering semiconductors as a career, that is the largest single hiring signal in the sector.
Physical capacity is being built in a few states rather than everywhere. Gujarat holds the Dholera fab and the Sanand packaging cluster of Micron, CG Semi and Kaynes; Assam has Tata's packaging plant; Odisha has two compound-semiconductor projects; and Uttar Pradesh has the HCL and Foxconn display-driver unit. Assembly is even more concentrated: Tamil Nadu shipped 41.63% of India's electronics exports in FY26, worth about US$20 billion, up from 32.84% two years earlier, on figures given to the Lok Sabha in July 2026.
The traffic runs in both directions, and the reason is worth understanding. Smartphone exports to the United States rose to US$19.7 billion in FY26 from US$10.6 billion the year before, according to an ICRIER brief published in July 2026, as brands moved assembly for the American market out of China. Smartphones have so far been exempted from US tariff action on India, which is why that shift has continued. Tariff policy, in effect, has been a demand transfer into Indian assembly plants.
Approved or already operating, with the date each was announced or opened
- 12 approved projects: one silicon fab, one silicon carbide fab, one display fab and nine packaging units.
- Micron, Kaynes, CG Semi, CDIL and Suchi Semicon in commercial production by September 2026.
- Tata's Dholera fab now expected to start commercial production in mid-2028.
- A second phase of ₹1,27,500 crore approved on 15 July 2026.
- 106 projects across 15 states and 30 product types under the component scheme.
- The latest 31 approved on 17 August 2026, carrying ₹7,877 crore of investment.
- Expected production of ₹5,34,101 crore and 74,628 direct jobs.
- 38 plants operating and 16 at an advanced stage.
- Tamil Nadu's share of India's electronics exports in FY26, up from 38% in FY25.
- Gujarat hosts the fab and the Sanand packaging cluster.
- Uttar Pradesh offers extra capital and land subsidies under its semiconductor policy.
- Assam and Odisha are new semiconductor locations with no previous electronics base.
- Chips to Startup's target of industry-ready chip and embedded designers.
- About 70,000 trained by September 2026, and 254 chips taped out by students by August 2026.
- AICTE published a model B.Tech in VLSI design and a diploma in IC manufacturing in 2023.
- This creates teaching, training and lab roles alongside the design jobs themselves.
9. The rules you will work inside
Electronics is among the most policy-driven industries a graduate can join in India, and it is shaped by a surprising number of separate bodies: the Ministry of Electronics and IT sets policy and runs the incentive schemes, the India Semiconductor Mission approves chip projects, the Bureau of Indian Standards runs compulsory product registration, the Directorate General of Foreign Trade controls imports of computers, STQC tests products for security, and the Electronics Sector Skills Council of India sets the qualifications for shop-floor roles. You do not need to memorise them. You do need to know which one governs the product you will work on, because that single fact determines what you test, what you certify and what can stop a shipment.
The body, what it controls, and why it matters to your job application
| Body | Controls | Why it matters to you |
|---|---|---|
| Ministry of Electronics and IT | Electronics policy, the phone and IT hardware incentive schemes, the component scheme | Publishes the production, export and approval numbers this report rests on |
| India Semiconductor Mission | Fab, packaging and display approvals, the design incentive, Chips to Startup | Decides which semiconductor plants exist, and therefore where those jobs are |
| Bureau of Indian Standards | Compulsory registration and safety testing of electronic and IT products | A product cannot be sold until it is registered, so compliance and test roles exist at every brand |
| DGFT | Import authorisations for laptops, tablets, personal computers and servers | The rule that pushed brands to assemble computers in India rather than import them |
| STQC | Security testing of CCTV cameras and other connected devices | Created demand for embedded security and test engineers almost overnight |
| ESSCI and NSDC | Shop-floor qualifications, apprenticeships, trainer and assessor certification | The certification route for diploma and ITI candidates entering assembly plants |
| AICTE | Engineering curricula, including the model B.Tech in VLSI design | Decides whether your college can offer the degree the industry now asks for |
| State governments | Land, power, capital subsidies and state electronics and semiconductor policies | Decide where plants are built, and therefore which city you will be working in |
Four rule changes have altered what the job looks like, and all four are live right now.
Each is either in force or on a published timetable
- The Electronics Component Manufacturing Scheme was notified in April 2025 with ₹22,919 crore.
- The Union Budget 2026-27 raised its outlay to ₹40,000 crore.
- Approved projects have committed ₹69,548 crore, above the ₹59,350 crore the scheme was designed to attract.
- If you are choosing between two manufacturing offers, a plant making parts will teach you more engineering than one assembling kits.
- Laptops, tablets, all-in-one PCs and servers need an import authorisation under the Import Management System.
- DGFT set the 2026 procedure on 17 December 2025; current authorisations run to 31 December 2026.
- MeitY may review the arrangement mid-term.
- The rule, together with the IT hardware incentive scheme, is why more computer assembly lines are opening in India.
- CCTV cameras were brought under compulsory registration by a MeitY notification of 9 April 2024.
- Cameras must pass security testing against the government's essential requirements as well as safety testing.
- The relaxation allowing old stock to be sold was withdrawn from 1 April 2026.
- Every connected device that follows this route creates test, firmware and compliance work.
- Investment from countries sharing a land border with India needs government approval under Press Note 3.
- Dixon's 51:49 joint venture with Vivo was approved on 8 July 2026.
- Its 74:26 joint venture with Longcheer had been approved in July 2025.
- Expect more Indian-majority joint ventures with Chinese technology partners, and more jobs inside them.
The mechanism is worth understanding once, because it explains most electronics news you will read. A scheme sets an outlay, projects are approved, states compete to host them, plants hire before they produce, and the statistics confirm it a year later. If you can place a news story on that chain, you can say something useful about it.
10. What could go wrong
Read this as a list of things to watch rather than reasons to stay away. Every risk here is documented in an official publication, a company filing or a published policy brief, and most of them are also, from a career point of view, job descriptions. The Ministry of Commerce's trade data is worth reading alongside the production figures, because it shows how much of each product is still imported.
Ranked by how directly each one touches an early-career role
| Risk | The evidence | How likely | What it means for you |
|---|---|---|---|
| Import dependence | Electronics imports rose 17.8% to US$116.17 billion in FY26, about 2.4 times exports | Certain, already measured | The sector's central unsolved problem, and therefore the most durable source of funded work in components, sourcing and design |
| Thin assembly margins | Dixon's adjusted operating margin was about 3.8%. PG Electroplast's fell to 8.4% and its profit fell 33.5% | Certain, already measured | Cost pressure lands on the shop floor first. Learn yield and cost, because that is what you will be measured on |
| Dependence on one product | Smartphones were 64.8% of India's electronics exports in April to June 2026 | High | A slowdown in one product line moves the whole sector. Experience across several product types is insurance |
| Incentives running out | The phone incentive scheme's budget line fell to ₹1,345 crore for 2026-27 from ₹6,960 crore | High | Plants built for the incentive must now compete on cost alone. Ask how a line's economics work without the subsidy |
| Trade policy abroad | The US imposed a new Section 301 tariff on India in July 2026; smartphones were exempted | Moderate | Export-led plants depend on that exemption holding. Watch it, and know which of your employer's products are exposed |
| Semiconductor delays | Tata's Dholera fab was reported in July 2026 to be targeting mid-2028 rather than 2026 | Moderate | Fab jobs arrive later than headlines suggest. Packaging and design jobs exist now |
| Lumpy orders and overseas units | Cyient DLM's revenue fell 17% in FY26; Centum wrote down ₹203 crore on overseas units | Moderate | Order-led businesses swing from year to year. Ask about the order book and how much of it is confirmed |
The risk that electronics manufacturers name most often in their own results is not demand. It is margin, and specifically the margin left once the cost of imported parts and the cost of running a line have both been paid. That is the single most useful thing to keep in mind when you compare two job offers in this sector: ask which one would still be profitable if its largest customer cut orders for a quarter, because for several companies in FY26 that is roughly what happened.
11. One company's year, in detail
Dixon Technologies is the largest listed electronics manufacturer in India, so its numbers are audited and public, and FY26 is the year its contract-manufacturing model was tested on margin rather than volume. It is also the clearest available answer to the question “can assembling other people's products be a good business in India”.
Dixon builds mobile phones, televisions, appliances, lighting and IT hardware for other brands, with its largest plants in Noida, and increasingly through joint ventures with the brands themselves. FY26, the year to 31 March 2026, is the year its revenue kept growing fast while the quality of its profit came under scrutiny.
What it establishes. Contract manufacturing in India can reach very large scale quickly, but only by accepting very thin margins. Dixon added roughly ₹10,700 crore of revenue in FY26, more than the entire revenue of all but two other companies in this report, and still kept less than 4 rupees of every hundred as adjusted operating profit. The same year, Data Patterns, a company one fifty-fourth its size, kept about 29 rupees of every hundred as net profit, because it owns its designs. That contrast is the most useful thing in this report to be able to explain in an interview.
What it does not establish. One strong year is not a track record. The headline profit growth was helped by one-off gains, the final quarter was weak, and the company's fortunes depend heavily on a small number of large phone customers. Say all of that if you are asked. Being able to argue both sides of a company you admire is unusual in a graduate candidate.
12. Latest news
The sector restates itself every quarter. These are the developments from the last two quarters that have actually changed something, each with the date it happened.
Pick one item, not all eight, and have a view on it. “Micron is producing at Sanand while the Dholera fab has moved to 2028, which tells me the first semiconductor jobs in India are in packaging and test, not wafer fabrication” is a better answer than reciting the list. Interviewers are testing whether you read, not whether you memorise.
13. The jobs themselves
Electronics hires into a small number of well-defined tracks, and the promise is real: you will be given a line, a product, a test station or a block of a chip to own far earlier than in most industries, because plants are opening faster than experienced people can be found to run them. The trade is that manufacturing roles often mean shift work and plant locations outside the big cities, and the compensation for that arrives as responsibility rather than as comfort.
One caveat before the tables. Vacancy counts, eligibility rules and pay scales change every recruitment cycle, and private-sector pay is not published in any reliable national benchmark. Always check the official notification or the offer letter rather than a coaching website, and check the year it was issued.
Most engineering candidates try only the first, and it is the most crowded
The public sector route, in detail
The route is exam-led and most candidates underestimate how specific it is. Bharat Electronics recruits probationary engineers in electronics, mechanical and other disciplines through a computer-based test followed by an interview; its 2025 notification, open from 24 October to 14 November 2025, was for 340 posts. The space and defence research route runs through the ISRO Centralised Recruitment Board and DRDO's Recruitment and Assessment Centre, which shortlists largely on GATE scores.
The important and widely missed detail: these organisations do much of India's in-house electronics design. A probationary engineer at BEL or a scientist at ISRO or DRDO is far more likely to work on a design that India owns than most private-sector graduates. For anyone who wants to design rather than assemble, that is the strongest argument for the public route.
Basic pay at entry, before dearness allowance, house rent allowance and other allowances
| Post | Pay level | Entry basic pay | Gate you must clear first |
|---|---|---|---|
| Probationary Engineer, Bharat Electronics | E-II grade, ₹40,000 to ₹1,40,000 | ₹40,000 per month | BE or B.Tech in the discipline, then BEL's computer-based test and interview |
| Scientist or Engineer SC, ISRO | Level 10 | ₹56,100 per month | BE or B.Tech with the required score, then the ISRO Centralised Recruitment Board test and interview |
| Scientist B, DRDO | Level 10 | ₹56,100 per month | A valid GATE score in the discipline, then shortlisting and interview by the Recruitment and Assessment Centre |
BEL scale from its 2025 probationary engineer notification, where the company indicated a cost to company of about ₹13 lakh a year; ISRO and DRDO entry posts sit at Level 10 of the Seventh Central Pay Commission matrix. These are basic pay only; gross pay is materially higher once allowances are added. Always check the specific recruitment notification.
What the first year actually looks like
Whichever route you enter by, the first year is dominated by the same thing: being close enough to the hardware to see what is not working. Even design and firmware roles in good electronics companies start with time on a bench or a line, and the ones that do not tend to produce engineers who design boards nobody can build.
Three entry routes converge on time with the hardware, then fan out
in year one
The tracks are not sealed. Moving from manufacturing or test into design after two or three years is a common transition, and it is much easier for someone who knows why a design fails on the line.
The skills that actually get you hired
For the public route, selection is largely the exam: core electronics, your discipline's GATE syllabus or the organisation's own test, then an interview. Preparation is a known quantity, and the highest-return move is to take GATE seriously in your final year, because several of these employers shortlist on it.
For everything else, three specific things pay off far more than general preparation. First, build one thing that works and be able to explain it. A board you designed, firmware you wrote or a chip block you verified is the single largest factor in most technical interviews. Second, learn one industry tool properly. A PCB design tool, a hardware description language with a simulator, or a test and measurement setup beats a list of course certificates; the Chips to Startup programme gives free design tools to more than 300 universities, so check whether yours is one of them. Third, know one rule properly, whichever one governs the role: BIS registration if you want to work at a brand, the component scheme if you want to work in a new plant, or the ESSCI qualifications if you want to lead a shop floor.
Prepare one project you can explain from the requirement down to the signal level, and rehearse it until you can draw it on a whiteboard. Then prepare the harder version: what went wrong while you built it, and how you found the fault. Almost every candidate prepares the first and almost none prepares the second, and the second is what the panel is actually looking for.
14. The numbers to learn, and what to do next
Eight terms carry specific meanings in this sector and are used loosely almost everywhere else. Knowing them precisely is the cheapest possible way to sound like someone who works in electronics rather than someone who has read about it.
Always separate production, approval and target. “₹13.11 lakh crore of production in FY26, 12 semiconductor projects approved, and a US$500 billion target for 2030-31” is a sentence almost no candidate can say. “India is becoming a chip hub” is a sentence anyone can say. The sector runs on public statements to Parliament and Cabinet decisions, and the people who have actually read them are a very small group.
What to do next. Six concrete steps, in the order they will actually help.
Every figure in this report is traceable to a Ministry of Electronics and IT statement, a Cabinet decision, a budget document, a company's own results release or a published recruitment notification, with the period stated in the text. Data is current as of 28 October 2026. Production and export figures are published about a year behind, so treat anything undated as context rather than fact. If you are reading across this series, the e-commerce version of this report and the FMCG version use the same method on very different sectors, and the wider careers library covers the roles named above in more depth.